Fume Hood Blog
-
Fume Hood Monitors: What the Rules Require and Which to Buy
A fume hood monitor is required by the standards your institution adopted, not by OSHA’s…
-

Laboratory Ventilation Sequence of Operation: Decide the Failure Direction First
A laboratory ventilation sequence of operation is a deliverable, not a description: it names every…
-

Laboratory Exhaust Manifold or Dedicated Runs? Decide the Architecture Before You Size Anything
Settle the exhaust architecture before you size anything: decide which services must stand alone, which…
-

Laboratory Air Changes per Hour: What to Decide
No single air change rate fits every laboratory. Derive the room air volume from hood…
-

What Is a Fume Hood?
What is a fume hood? It is a ventilated enclosure that captures hazardous vapors, gases,…
-

Where Does Fume Hood Exhaust Go?
Fume hood exhaust goes to the atmosphere above the building in a ducted system —…
-

Laboratory Exhaust System Design: A Project-Level Decision Guide
Laboratory exhaust system design is a decision sequence, not a single calculation.
-

Fume Hood Size Guide: Match the Chamber to the Apparatus
A fume hood size guide that starts with the apparatus: four nested layers, the airflow…
-

Fume Hood Maintenance Checklist: What to Check, Repair or Escalate
A fume hood maintenance checklist only works when it names who checks, who repairs and…



